Smart Sewer System Plan with Infiltration Solutions

Airport Business Center: Smarter Planning, More Efficient Execution

The impressive Airport Business Center In Diegem, the project is taking further shape in its second construction phase. The site development and associated sewer work involve a great deal of technical customization. Together with ELM, Deschacht helped devise a more efficient implementation of the original sewer plan, incorporating smart infiltration solutions and lighter, more practical plastic alternatives.

From concrete to plastic. From a standard plan to a smart construction site solution.

A strong construction team, a trusted partnership

General contractor Van Laere is responsible for carrying out the project. For all landscaping work, the company has enlisted the help of ELM, a well-established specialist in landscape design and landscaping. ELM has also been a loyal customer of Deschacht for many years. That relationship of trust formed the basis for working together to find the best technical solutions for this project as well.

From Plan to Practical Optimization

ELM submitted the original environmental plan to Deschacht. Our engineering department reviewed the design critically and made adjustments where necessary, taking into account the significant differences in elevation and the limited workspace on the construction site.

An initial major optimization involved the infiltration basins. The original plans called for two infiltration tunnels side by side, covered with boulders. Given the scale and the load, this design proved technically unfeasible. Deschacht therefore proposed IT Plus Columnbox Infiltration Crates for. They are easily stackable, offer a large storage capacity, and allow for the transport of more infiltration material per trip. An efficient choice, both technically and cost-wise.

The choice of pipes was also reconsidered. The concrete pipes that had been planned were replaced by PP Ribwall IT Infiltration Pipes. Because they are lighter, they are easier to handle and position. Given the significant differences in elevation and the limited maneuvering space at this construction site, this offers a significant practical advantage.

The same principle was applied to the inspection and pump pits. Where concrete pits had originally been planned, the construction team opted for HDPE Plastic Wells, including an inspection chamber that is no less than 6 meters high and a custom-made pump chamber. Plastic offers greater flexibility during installation and makes customization easier.

Greenfix Green Roof Solution

The green roof above the underground garage was also designed using solutions from Deschacht. Based on our own Greenfix Product Line For Level 0, we supplied, among other things, approximately 6,500 m² of dimpled plastic sheeting in various thicknesses, root-barrier sheeting, protective fabric, and about 500 m² of substrate panels.

Working Together Makes a Difference

For ELM, the close collaboration with Deschacht is a significant added value. Project Manager Tom Geleyn (ELM) emphasizes the smooth collaboration with the Deschacht team:

“They actively contribute their ideas, evaluate the plans from a practical perspective, and work with us to find solutions that are technically sound and feasible on the job site. Those direct lines of communication and their commitment really make all the difference for us.”

GOING ABOVE AND BEYOND

This project demonstrates how a critical review of the original design can lead to better material choices, smoother execution, and a more efficient construction site. Deschacht collaborates, provides guidance, and translates plans into solutions that work in practice.

PROJECT PARTNERS

  • Project: Airport Business Center – Phase 2
  • General Contractor: Van Laere
  • Subcontractor for site preparation: ELM
  • Water Management and Sewerage Materials: Deschacht
  • Deschacht contact person: Willy De Schagt
  • ELM Project Manager: Tom Geleyn

Share this realization

Subscribe to our newsletter

Stay up to date with our latest news.

Related achievements

Construction of a drinking water pipeline route with HDPE pipes in Beloeil

View project

A sewage network for a military building optimized by Deschacht's design department

View project

Flat roof I Nieuwpoort

View project

New flat roof Residence Orchidee I Kluisbergen

View project

Colruyt | Binche

View project

Subscribe to our newsletter!

Stay up to date with news and updates tailored to your field.