Rail bypass drainage Mechelen

Client: NMBS

General contractor: CIT Blaton

NMBS equipped the Mechelen station with 2 new platforms and extra tracks with a 3,000 m² canopy. Deschacht redesigned the drainage plan and supplied the pipes to drain water from the roof, the roof emergency overflow, and the track troughs beneath the tracks. To drain water from the emergency overflow and the track troughs, PP pipes with diameters ranging from 315 to 600 mm were proposed. These were connected using standard socket joints, which is easier than air-tight welding of high-pressure pipes in hard-to-reach areas. The mounting brackets had to be strong enough and additionally anchored to support the weight of the water.

IMG 20190814 150728

Share this realization

Subscribe to our newsletter

Stay up to date with our latest news.

Related achievements

Insulation for new healthcare campus

View project

New roof with custom zinc fold work in ’s Gravenwezel

View project

Deschacht offers the ultimate solution for a precarious installation in Dessel

View project

Retention basin with Tubao tanks

View project

Deschacht supplies duct pipes for 667-meter-long horizontal directional drilling in the port of Zeebrugge

View project

Subscribe to our newsletter!

Stay up to date with news and updates tailored to your field.