Geothermal project: new construction of forensic departments PC Sint-Jan-Baptist

On the Suikerkaai campus of PC Sint-Jan-Baptist in Ghent, a new construction project is rising for the forensic wards Encarga 1, 2, and 3. This realization represents an important step in the renewal of the infrastructure for forensic psychiatry.

The new building will replace the current infrastructure, which currently houses 45 patients. With the design by Archipl Architecten and execution by Bekaert Building Company, the foundation is laid for a modern care environment with space for 45 beds. These are distributed across three specialized residential units, each with its own care mission. In addition to the units, the building also includes administrative and logistic functions, therapy rooms, and technical rooms in the basement.

Sustainable energy via geothermal heat

For the heating of the building, a sustainable solution was chosen: geothermal energy. Specialist Mouton carried out the geothermal drilling for this: 60 boreholes, each 150 meters deep. These boreholes form the basis of the entire heating network. With their expertise in geothermal energy and HVAC, Mouton delivers energy-efficient turnkey projects and makes green energy accessible for large-scale buildings.

Geosondes and collector wells from Deschacht

Deschacht supplied the essential materials for this geothermal project:

  • 60 HDPE geothermal probes (diameter 40, PE100 RC, SKZ-approved and pressure tested).
  • Two custom-made collector wells, with 28 and 32 connections respectively.
  • The horizontal piping for the connection between the probes, the collector wells, and the heat pump.

The custom-produced HDPE collector wells make it possible to bring together multiple geothermal probes and connect them efficiently to the heat pump.

“With this installation, we demonstrate that geothermal energy offers a sustainable and reliable solution even in complex healthcare projects. Our collaboration with Deschacht is always smooth and professional. For our vertical drilling operations, we can count on a total solutions provider that delivers the right materials on time.”

Deschacht, partner in geothermal energy

Geothermal projects require reliable and durable piping systems. Deschacht distributes all necessary materials for both vertical drilling (50 to 150 m deep) and horizontal piping. Thanks to our expertise and stock, we are the ideal partner for geothermal projects in Belgium. With this project, Deschacht once again proves its added value in supporting sustainable and innovative energy solutions.

Deschacht realization Sint-Jan Baptist PC geothermal energy 3

Share this realization

Subscribe to our newsletter

Stay up to date with our latest news.

Related achievements

A new piece of greenery in the heart of Ostend

View project

Biodiverse green roof adds value to single-family home in Borgerhout

View project

Renovation of flat roofs at Belgian Icecream Group: sustainable partnership between Suerickx and Deschacht

View project

Renovation of Leuven City Hall: smart rainwater retention on a unique construction site

View project

Redevelopment of parking spaces IKEA Zaventem: sustainable water infiltration central

View project

Subscribe to our newsletter!

Stay up to date with news and updates tailored to your field.