Hydro-Brake® Optimum flow regulator for Eloy Park in Engis

As part of the redevelopment of the former CEGRAM industrial site in Engis, the Eloy Group is currently developing Eloy Park, a 10-hectare site that will house a new industrial ecosystem starting in 2025. In collaboration with Euroports, multiple logistics halls and storage floors are being built, contributing to the expansion of the Port of Engis, a major port infrastructure hub in Europe.

In this context, Eloy has entrusted Deschacht with a major technical challenge: equipping the site with a flow control system capable of managing an exceptional flow rate of 165 liters per second.

Unique solution for huge flow rate of 165 l/s

The urban planning permit imposed an exceptionally high flow rate. A standard solution was impossible. Not a single competitor was able to offer a sustainable, calculated and validated device capable of regulating such a flow rate. The chosen solution: a Hydro-Brake® Optimum vortex flow control device, fully custom-made in AISI 304 stainless steel by our partner Hydro International. Compared to a traditional regulator, this model stands out for its vortex effect, which makes it possible to achieve an impressive flow rate of 165 l/s with a low head of water. Moreover, this is the first application of this technology in Belgium, a true innovation in the field of hydraulic regulation.

Why the vortex technology?

Unlike classical systems with an opening or a flap, vortex technology uses a natural hydrodynamic principle:

  • the incoming flow generates a vortex that precisely regulates the flow rate,
  • no motorized mechanism necessary,
  • The system remains operational, even during a power outage.

The technical advantages are numerous:

  • Hydraulic stability: management of peak flows and optimal downstream protection.
  • Self-cleaning effect: the vortex limits deposits and greatly reduces the risk of clogging.
  • Reliability: no moving parts, so low wear and maintenance.
  • Optimization: reduction of the required storage volume in the basins.
  • Robustness: stainless steel construction for durability and strength

For this project, the large-format flow regulator was placed in a concrete chamber with an internal diameter of 2 x 2 meters. Hydro International also provided the installation instructions, including for the placement of the device in an ideal position.

A successful joint project

Our project manager Nordine, together with Eloy Travaux and our partner Hydro International, coordinated this project from A to Z. Thanks to this partnership and the integration of vortex technology, the new warehouse in Hermalle-sous-Huy features an innovative, sustainable hydraulic system that is fully tailored to the future needs of Eloy Park.

484 EloyPark Regulateur Vortex 2

Share this realization

Subscribe to our newsletter

Stay up to date with our latest news.

Related achievements

Wangenies is modernizing its sewerage network with ductile iron from Electrosteel

View project

Redevelopment of parking spaces IKEA Zaventem: sustainable water infiltration central

View project

KWZI De Klijte Heuvelland: custom-made work of the purest kind

View project

Low-profile Hauraton drainage channel for Hansbeke station

View project

Aquafin – Ribwall IT | Schoten

View project

Subscribe to our newsletter!

Stay up to date with news and updates tailored to your field.