ribwall sewerage

Client: Infrabel

Contractor: Hens nv

Infrabel is laying two extra railway lines between Ghent and Bruges with a new sewage system in between. Contractor Hens therefore expanded the existing railbed between Aalter and Landegem and installed 8 km of Ribwall infiltration pipes beneath the tracks. At Infrabel's request, Deschacht had them manufactured in stiffness class SN16. This is because the pipes will have to withstand a great deal of pressure from the trains. PP-Ribwall was specifically used because it is stronger than regular PVC, and to allow rainwater between the tracks to quickly infiltrate into the ground and drain excess water to the sewage system.

The Bellem615 Shaft scaled 1

Share this realization

Subscribe to our newsletter

Stay up to date with our latest news.

Related achievements

Water pumping: a technical challenge turned into a custom solution

View project

The new Ixina facades, clad in Fundermax panels

View project

Drainix®: an infiltrating storage floor for Hubo Marche-en-Famenne

View project

207 meters of Faserfix? We'll deliver them tomorrow!

View project

Indoor Playground – Mega Speelstad | Wechelderzande

View project

Subscribe to our newsletter!

Stay up to date with news and updates tailored to your field.