The Delhaize branch in Ath, Hainaut, is being expanded. To supply the sprinkler system with water, a buffer tank of around 160 m³ is needed. Normally,

this solved by constructing a waterproof concrete tub. Here we work with two Tubao pipes of 2.30 m diameter, a total of 39 m long. These were installed with a

80 cm of cover. The pipes were joined together with a waterproof collar. They were then covered with a geogrid and backfilled with earth. This zone becomes a parking lot

so as the final layer asphalt was poured. With the Tubao steel pipes, the execution of the works was accelerated by 2 weeks.

Deschacht 17

Share this realization

Subscribe to our newsletter

Stay up to date with our latest news.

Related achievements

Mapping industrial wastewater: a customized solution for La Vache Bleue

View project

High-quality monolithic drainage channels

View project

3D BIM drainage plan for Infrabel

View project

Drainix Traffic by Deschacht: sustainable permeable paving for heavy traffic

View project

Geothermal drilling on the rise thanks to surging energy prices

View project

Subscribe to our newsletter!

Stay up to date with news and updates tailored to your field.