Tubao Water Reservoir

Client: BMW Garage Meerschmann

Contractor: Willy Naessens Group

Near the Albatros roundabout in Erembodegem, the new branch of the Meerschmann garage, a dealer for BMW and Mini, is nearing completion. Two large

constructed. Instead of a traditional concrete basin, the client opted for a

custom-made solution by the Tubao-Deschacht duo

.The galvanized steel pipes from the French manufacturer

penetrate ever deeper into the market. Wherever (rain)water needs to be buffered, stored, redirected or infiltrated, developers, architects and engineering firms are increasingly opting for a solution featuring corrugated Tubao pipes. This was also the case for the construction of two reservoirs at the site of the new BMW-Mini dealership in the Sterrenhoek industrial estate in Aalst-Erembodegem.

Installed in half a day

In this case, it concerns two tanks, formed from

3 meter diameter PVC pipes

. One has a total

storage of the captured rainwater

that can serve as fire-fighting water for the fire department. To this end, the pipe was equipped with suction lines to which the fire department can connect if necessary. The

second tank measures 34.50 meters

and will supply the sprinkler system with clean tap water. The necessary suction pipes were also installed here. The two tanks were transported to the site by Deschacht, where earthworks contractor GLK had the pipes lowered into pre-excavated trenches. Tubao provided the necessary connections and further finishing. The entire installation was inspected and certified by an independent engineer. Duration of the installation: half a day! «

When you compare this to 4 to 6 weeks for a concrete tub, you understand the choice for this alternative

», Geert Vanhecke concludes.

Tubao Erembodegem 1 scaled 1

Share this realization

Subscribe to our newsletter

Stay up to date with our latest news.

Related achievements

Case study: Deschacht integrates VMSW coding into its own BIM library

View project

Renovation of historical roof Neerhoeve

View project

KWZI De Klijte Heuvelland: custom-made work of the purest kind

View project

Complete roof extension with Supergamma

View project

At the heart of the sewerage solutions of the Mobi’Park TEC Tilleur site

View project

Subscribe to our newsletter!

Stay up to date with news and updates tailored to your field.