Retention basin with Tubao tanks

Client: Orval Brewery

Contractor: Lecomte sa

The Orval brewery is expanding. Lecomte sa installed a buffer basin and three lifting stations for this purpose. The buffer basin was created by connecting two 45 m³ Tubao tanks, a quick and simple operation. Deschacht supplied the three lifting stations, which have three different functions: pumping rainwater from the lowest cellar to the buffer basin, pumping wash water to the sewer system, and finally pumping production water from the brewery and the cheese dairy to the nearby wastewater treatment plant. The final pump pit is made of HDPE to withstand the acidity of the water flowing through it.

orval 2020 07 01 at 13.46.37

Share this realization

Subscribe to our newsletter

Stay up to date with our latest news.

Related achievements

An aesthetic and sustainable solution for flat and pitched roofs

View project

Electrification of De Lijn: Collinet delivers custom solutions for extinguishing water collection

View project

Collinet is supplying Fluvius Lokeren with 6 sized oil-water separators with solar-powered alarm function

View project

HDPE drainage pipes for tram depot renovation project

View project

Construction company Dethier models large construction project with BIM from Deschacht

View project

Subscribe to our newsletter!

Stay up to date with news and updates tailored to your field.