{"id":2732,"date":"2024-04-05T09:01:25","date_gmt":"2024-04-05T07:01:25","guid":{"rendered":"https:\/\/www.deschacht.eu\/realisaties\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\/"},"modified":"2026-05-27T15:02:13","modified_gmt":"2026-05-27T13:02:13","slug":"tubao-buffer-tank-installed-in-less-than-1-day","status":"publish","type":"realisaties","link":"https:\/\/www.deschacht.eu\/en\/realisaties\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\/","title":{"rendered":"Tubao buffer tank installed in less than 1 day!"},"content":{"rendered":"<p class=\"wp-block-paragraph\">invests in a new commercial building of 5,000 m\u00b2. This<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">is necessary for the further development of the group, specifically the timber construction department. The company is also investing in more environmentally friendly construction processes. Moulard, an earthmoving contractor, called upon the expertise of Deschacht.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">A joinery for the future<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">It goes without saying that Dherte knows a thing or two about carpentry. Since 1880, the construction company has made it its specialty. Today, 35 of the group's 300 employees are carpenters. And there will be even more, thanks to a new factory that began<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">will be put into service in 2024.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The new building comprises 4,500 m\u00b2<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">workshops and 500 m\u00b2<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">office space. Beneath the buildings, 2 Deschacht products will be installed: a 141 m\u00b3 Tubao tank<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">and a 75 m\u00b3 HDPE tank<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Tailor-made advice from Deschacht<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Damien Dufranne, the project manager at Dherte, explains the water collection: \u201cThe planning permission required a storm basin of at least 100 m\u00b3<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">and a reserve of 40 m\u00b3<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">for circular water management.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">So the initial plans were drawn up according to those specifications, before being passed on to contractor Moulard, who won the contract for the earthworks, drainage, and landscaping.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">But as Christophe Moulard explains, there were technical consequences due to the topography and moisture of the site: \u201cTo avoid the risks of instability and the additional costs of a pumping station to the existing sewerage system, we were not allowed to dig too deep.\u201d.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Christophe Moulard also remembers that the original order called for a complex assembly: \u201cWhen we made an inventory of all the equipment we would need, we came up with 7 concrete tanks of 20 m\u00b3<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">and an equal number of connectors and inspection chambers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The contractor entrusted the plans to our engineering firm. The solution was optimized in every respect: functionality, budget, and implementation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Save with Tubao<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The first optimization that Nordine Zeryouhi,<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">proposed by the Deschacht engineering firm, was the replacement of the seven concrete tanks at the front of the building with a Tubao buffer tank.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe Tubao is a galvanized steel tank that is highly modular and exceptionally quick to install. The earthmover only has to dig one pit instead of seven, and the entire installation is completed in less than a day,\u201d Nordine explains.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That is confirmed by Christophe Moulard, who estimates that about four full working days were saved.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The other immediate benefit is the reduction in the number of inspection chambers from 7 to 2. After all, the Tubao only needs to be inspected upstream to check the incoming flow rate, and downstream to check the outgoing flow rate. \u201cThat means a direct saving on the budget,\u201d says Nordine.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">HDPE tank for stability<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">At the back of the building, a different solution was needed. Due to the boggy soil and limited maneuvering space, Nordine chose an HDPE tank.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThat is a large pipe made of recycled PE, 75 meters long and 1 meter in diameter,\u201d Nordine explains. \u201cSo it is a very light and easy-to-install tank.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This system, just like the Tubao, was a first for Moulard, who received assistance on site from Deschacht.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThey came here twice to follow the installation,\u201d says Christophe Moulard. He adds, \u201cWe felt very well supported from the beginning to the end of the project. Specifically, the 6-meter sections are easy to fit together, with the assurance that the system is watertight.\u201d.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The services of the Deschacht engineering consultancy<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Dherte's carpentry shop now has a sustainable and optimized rainwater management system, and Moulard has kept its costs under control and saved valuable working days.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Deschacht's engineering department optimizes the details of every project to ensure gains, savings, and safety across the board. What's more, this service is not charged if the materials are ordered from Deschacht.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-id=\"41208\" src=\"https:\/\/www.deschacht.eu\/wp-content\/uploads\/2026\/05\/dherte-2.webp\" alt=\"dherte 2\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-id=\"41206\" src=\"https:\/\/www.deschacht.eu\/wp-content\/uploads\/2026\/05\/Dherte-3.webp\" alt=\"Dherti 3\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-id=\"41198\" src=\"https:\/\/www.deschacht.eu\/wp-content\/uploads\/2026\/05\/Dherte-1.webp\" alt=\"Dherte 1\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-id=\"41200\" src=\"https:\/\/www.deschacht.eu\/wp-content\/uploads\/2026\/05\/Dherte-4.webp\" alt=\"Dherte 4\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-id=\"41202\" src=\"https:\/\/www.deschacht.eu\/wp-content\/uploads\/2026\/05\/Dherte-5.webp\" alt=\"Dherte 5\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-id=\"41204\" src=\"https:\/\/www.deschacht.eu\/wp-content\/uploads\/2026\/05\/Dherte-6.webp\" alt=\"Dherte 6\"\/><\/figure>\n\n<\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Moulard SCA<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">services for all types of earthworks: drainage, tank installation, demolition, pond cleaning, and all other landscaping work.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" src=\"https:\/\/www.deschacht.eu\/wp-content\/uploads\/2026\/05\/Dherte-5.webp\" alt=\"Dherte 5\"\/><\/figure>","protected":false},"featured_media":2737,"template":"","meta":{"_acf_changed":false},"activiteiten":[177,174],"producten":[148,151],"class_list":["post-2732","realisaties","type-realisaties","status-publish","has-post-thumbnail","hentry","activiteiten-engineering","activiteiten-weg-en-rioolwerken","producten-opslagtank","producten-tubao"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tubao-buffertank geplaatst in \u00e9\u00e9n dag | Deschacht<\/title>\n<meta name=\"description\" content=\"Deze Tubao-buffertank werd in minder dan \u00e9\u00e9n dag geplaatst. Ontdek hoe dat kan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.deschacht.eu\/en\/achievements\/tubao-buffer-tank-installed-in-less-than-1-day\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tubao-buffertank geplaatst in \u00e9\u00e9n dag | Deschacht\" \/>\n<meta property=\"og:description\" content=\"Deze Tubao-buffertank werd in minder dan \u00e9\u00e9n dag geplaatst. Ontdek hoe dat kan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.deschacht.eu\/en\/achievements\/tubao-buffer-tank-installed-in-less-than-1-day\/\" \/>\n<meta property=\"og:site_name\" content=\"Deschacht Bouwmaterialen\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-27T13:02:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.deschacht.eu\/wp-content\/uploads\/2026\/05\/Dherte-5.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.deschacht.eu\\\/realisaties\\\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\\\/\",\"url\":\"https:\\\/\\\/www.deschacht.eu\\\/realisaties\\\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\\\/\",\"name\":\"Tubao-buffertank geplaatst in \u00e9\u00e9n dag | Deschacht\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.deschacht.eu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.deschacht.eu\\\/realisaties\\\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.deschacht.eu\\\/realisaties\\\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.deschacht.eu\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/Dherte-5.webp\",\"datePublished\":\"2024-04-05T07:01:25+00:00\",\"dateModified\":\"2026-05-27T13:02:13+00:00\",\"description\":\"Deze Tubao-buffertank werd in minder dan \u00e9\u00e9n dag geplaatst. Ontdek hoe dat kan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.deschacht.eu\\\/realisaties\\\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.deschacht.eu\\\/realisaties\\\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.deschacht.eu\\\/realisaties\\\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.deschacht.eu\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/Dherte-5.webp\",\"contentUrl\":\"https:\\\/\\\/www.deschacht.eu\\\/wp-content\\\/uploads\\\/2026\\\/05\\\/Dherte-5.webp\",\"width\":1920,\"height\":1440},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.deschacht.eu\\\/realisaties\\\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.deschacht.eu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tubao buffertank geplaatst in minder dan 1 dag!\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.deschacht.eu\\\/#website\",\"url\":\"https:\\\/\\\/www.deschacht.eu\\\/\",\"name\":\"Deschacht Bouwmaterialen\",\"description\":\"Impact en verandering in de bouwsector.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.deschacht.eu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.deschacht.eu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.deschacht.eu\\\/#organization\",\"name\":\"Deschacht Bouwmaterialen\",\"url\":\"https:\\\/\\\/www.deschacht.eu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.deschacht.eu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.deschacht.eu\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Deschacht-Logo.svg\",\"contentUrl\":\"https:\\\/\\\/www.deschacht.eu\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Deschacht-Logo.svg\",\"caption\":\"Deschacht Bouwmaterialen\"},\"image\":{\"@id\":\"https:\\\/\\\/www.deschacht.eu\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tubao buffer tank installed in one day | Deschacht","description":"This Tubao buffer tank was installed in less than a day. Find out how.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.deschacht.eu\/en\/achievements\/tubao-buffer-tank-installed-in-less-than-1-day\/","og_locale":"en_US","og_type":"article","og_title":"Tubao-buffertank geplaatst in \u00e9\u00e9n dag | Deschacht","og_description":"Deze Tubao-buffertank werd in minder dan \u00e9\u00e9n dag geplaatst. Ontdek hoe dat kan.","og_url":"https:\/\/www.deschacht.eu\/en\/achievements\/tubao-buffer-tank-installed-in-less-than-1-day\/","og_site_name":"Deschacht Bouwmaterialen","article_modified_time":"2026-05-27T13:02:13+00:00","og_image":[{"width":1920,"height":1440,"url":"https:\/\/www.deschacht.eu\/wp-content\/uploads\/2026\/05\/Dherte-5.webp","type":"image\/webp"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.deschacht.eu\/realisaties\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\/","url":"https:\/\/www.deschacht.eu\/realisaties\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\/","name":"Tubao buffer tank installed in one day | Deschacht","isPartOf":{"@id":"https:\/\/www.deschacht.eu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.deschacht.eu\/realisaties\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\/#primaryimage"},"image":{"@id":"https:\/\/www.deschacht.eu\/realisaties\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\/#primaryimage"},"thumbnailUrl":"https:\/\/www.deschacht.eu\/wp-content\/uploads\/2026\/05\/Dherte-5.webp","datePublished":"2024-04-05T07:01:25+00:00","dateModified":"2026-05-27T13:02:13+00:00","description":"This Tubao buffer tank was installed in less than a day. Find out how.","breadcrumb":{"@id":"https:\/\/www.deschacht.eu\/realisaties\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.deschacht.eu\/realisaties\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.deschacht.eu\/realisaties\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\/#primaryimage","url":"https:\/\/www.deschacht.eu\/wp-content\/uploads\/2026\/05\/Dherte-5.webp","contentUrl":"https:\/\/www.deschacht.eu\/wp-content\/uploads\/2026\/05\/Dherte-5.webp","width":1920,"height":1440},{"@type":"BreadcrumbList","@id":"https:\/\/www.deschacht.eu\/realisaties\/tubao-buffertank-geplaatst-in-minder-dan-1-dag\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.deschacht.eu\/"},{"@type":"ListItem","position":2,"name":"Tubao buffertank geplaatst in minder dan 1 dag!"}]},{"@type":"WebSite","@id":"https:\/\/www.deschacht.eu\/#website","url":"https:\/\/www.deschacht.eu\/","name":"Deschacht Building Materials","description":"Impact and change in the construction sector.","publisher":{"@id":"https:\/\/www.deschacht.eu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.deschacht.eu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.deschacht.eu\/#organization","name":"Deschacht Building Materials","url":"https:\/\/www.deschacht.eu\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.deschacht.eu\/#\/schema\/logo\/image\/","url":"https:\/\/www.deschacht.eu\/wp-content\/uploads\/2026\/03\/Deschacht-Logo.svg","contentUrl":"https:\/\/www.deschacht.eu\/wp-content\/uploads\/2026\/03\/Deschacht-Logo.svg","caption":"Deschacht Bouwmaterialen"},"image":{"@id":"https:\/\/www.deschacht.eu\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.deschacht.eu\/en\/wp-json\/wp\/v2\/realisaties\/2732","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.deschacht.eu\/en\/wp-json\/wp\/v2\/realisaties"}],"about":[{"href":"https:\/\/www.deschacht.eu\/en\/wp-json\/wp\/v2\/types\/realisaties"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.deschacht.eu\/en\/wp-json\/wp\/v2\/media\/2737"}],"wp:attachment":[{"href":"https:\/\/www.deschacht.eu\/en\/wp-json\/wp\/v2\/media?parent=2732"}],"wp:term":[{"taxonomy":"activiteiten","embeddable":true,"href":"https:\/\/www.deschacht.eu\/en\/wp-json\/wp\/v2\/activiteiten?post=2732"},{"taxonomy":"producten","embeddable":true,"href":"https:\/\/www.deschacht.eu\/en\/wp-json\/wp\/v2\/producten?post=2732"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}